Hi, Sorry to join this debate a little late!
I think I'm possibly one of the longest standing users of a fully installed C-bus system (Some 2 years.) on the ukha group.
At the time of my install c-bus was pretty new and I think its fair to say there were a few unaswered questions.
The technical manager of the time a guy called Niall was NOT recomending the install of MCB's on the outgoing channel and as a result I have NO outgoing protection. Indeed the install documentation of the time makes no reference to protection on the outward side.
My proffesional electrician also did not recomend there use.
In two years I've had no problems! (Oh boy why do I feel I'm going to regret saying this!).
Now I'm wondering if I should retro-fit a load of 1am MCB's to my install, which could leave me some interesting space issues in my consumer units!
![]()
Ho hum!
Rob
P.S. Anyone reading this who is undecided about installing c-bus. Do it! It is fantastic and 100% reliable!