Hi,
I am lookign to throw in a few LW12's as a refit, and just wondering how people have acheived this from the point of view of placing a number of these units behind a switch.
I am looking to put 2, possible 3 units behind a switch, but this may not be possible. One place, I am putting it in is a 5 gang double switch, and I would probably want to put 3 units in here, but think I may only get away with 2. One thing I was considereing was reducing it to a clipsal 5 gang single switch, and putting the lw12's posibly behind the space where I was blanking off or covering over.
The other areas, I am looking to put them in are pasterbaord walls, so think I may be able to create additional space in the cavity for this to locate the units
Any one done anything like this before ?
Regards,
Eamon
I am lookign to throw in a few LW12's as a refit, and just wondering how people have acheived this from the point of view of placing a number of these units behind a switch.
I am looking to put 2, possible 3 units behind a switch, but this may not be possible. One place, I am putting it in is a 5 gang double switch, and I would probably want to put 3 units in here, but think I may only get away with 2. One thing I was considereing was reducing it to a clipsal 5 gang single switch, and putting the lw12's posibly behind the space where I was blanking off or covering over.
The other areas, I am looking to put them in are pasterbaord walls, so think I may be able to create additional space in the cavity for this to locate the units
Any one done anything like this before ?
Regards,
Eamon
Comment