I've specced 12way DIN mounted modules to control whole house lighting near the CU
I'll then run 1.00 T&E to each light.
For sockets, the cost and space require to run dedicated 2.5T&E just doesn't appeal to me...especially with the hassle of reverting the system back when it comes to selling.
I'll then run 1.00 T&E to each light.
For sockets, the cost and space require to run dedicated 2.5T&E just doesn't appeal to me...especially with the hassle of reverting the system back when it comes to selling.
Comment