Hi all,
It has been a while since I last posted mainly due to work.
Current project is to completely gut and re-decorate the downstairs WC. It has suffered condensation since we moved in with the hot humid kitchen on one side and cold integrated garage on the other. In removing all the plasterboard to improve insulation and use fermacell boards it was also apparent that howling gales were coming through the window fitting (large gaps) and poor jointing on the walls. All now rectified and with the addition of a heat-recovery extraction fan this should be the end to the condensation. With the ceiling down this gives me an opportunity for other work.
I have a teenage son who spends way too much time on the various game consoles. I'd like to make him more aware of the time he spends on games and reduce my electricity bill. I can give him a quote and setup hourly announcements. But ultimately I want to be able to turn off the equipment if he leaves to go out or if the quota is reached. My though are as follows:
Thoughts, anyone done something similar?
Paul
It has been a while since I last posted mainly due to work.
Current project is to completely gut and re-decorate the downstairs WC. It has suffered condensation since we moved in with the hot humid kitchen on one side and cold integrated garage on the other. In removing all the plasterboard to improve insulation and use fermacell boards it was also apparent that howling gales were coming through the window fitting (large gaps) and poor jointing on the walls. All now rectified and with the addition of a heat-recovery extraction fan this should be the end to the condensation. With the ceiling down this gives me an opportunity for other work.
I have a teenage son who spends way too much time on the various game consoles. I'd like to make him more aware of the time he spends on games and reduce my electricity bill. I can give him a quote and setup hourly announcements. But ultimately I want to be able to turn off the equipment if he leaves to go out or if the quota is reached. My though are as follows:
- Multiple QRH-001 - 6M DIN rail enclosure with 4 x 16A SPCO relays
- Change sockets from ring main to radial fed from the QRH
- Add more sockets say 4 banks of six
- Feed QRHs with need radial circuit direct from the CU
- For the main components, TV, PS, Computer, Monitor use fused spur to replace socket
Thoughts, anyone done something similar?
Paul
Comment