Interesting.
I know when you are testing a single ring circuit you are supposed to turn off the others, to avoid for want of a better word cross contamination. One way would be to put in a din rail mounted energy meter after the circuit breaker for the ring, then clamp on the output side of this. Or use the blinking led to measure power consumption.