I am NOT a heating engineer, as may be obvious from this question and diagram, BUT could this simplified Hot Water & Central Heating system layout/design actually work?
By 'simplified' i mean NO S-Plan or Y-Plan 2/3 port valves required.
HEATING SYSTEM.jpg
Evohome could still control the calling of heat from the boiler using the standard Evo Hot Water temperature sensor and the radiators with their HR92 TRV's. I realise the Hot Water cylinder would get heated everytime any part of the system calls for heat, but is that such a bad thing? A heated towel rail or uncontrolled radiator could be used in addition to the ABV when all the TRVs are closed.
I am NOT proposing to do this, but just wondered what the issues would be?
Regards..
By 'simplified' i mean NO S-Plan or Y-Plan 2/3 port valves required.
HEATING SYSTEM.jpg
Evohome could still control the calling of heat from the boiler using the standard Evo Hot Water temperature sensor and the radiators with their HR92 TRV's. I realise the Hot Water cylinder would get heated everytime any part of the system calls for heat, but is that such a bad thing? A heated towel rail or uncontrolled radiator could be used in addition to the ABV when all the TRVs are closed.
I am NOT proposing to do this, but just wondered what the issues would be?
Regards..