Results 1 to 3 of 3

Thread: Binding order

  1. #1
    Automated Home Jr Member
    Join Date
    Sep 2015
    Posts
    12

    Default Binding order

    Good afternoon,

    I'm just setting up a new system for somebody and I remember seeing information about initial binding order ... For the life of me I can't find it, I also remember that people thought the instructions were kind of vague on this info

    Am I right is saying it should be boiler thermometer, boulder BDR91, then heating BDR91 then the zone valves?

    Thanks in advance
    Fletch

  2. #2
    Automated Home Legend
    Join Date
    Jan 2015
    Location
    NE UK
    Posts
    1,378

    Default

    Quote Originally Posted by Fletch79 View Post
    Good afternoon,

    I'm just setting up a new system for somebody and I remember seeing information about initial binding order ... For the life of me I can't find it, I also remember that people thought the instructions were kind of vague on this info

    Am I right is saying it should be boiler thermometer, boulder BDR91, then heating BDR91 then the zone valves?

    Thanks in advance
    Fletch
    If you have domestic hot water as part of your system - water kept hot in a tank - then bind the hot water sensor first. Then do the central heating in any order you wish.

  3. #3
    Automated Home Jr Member
    Join Date
    Sep 2015
    Posts
    12

    Default

    Cheers for that ...

    Have got the heating working but had underestimated the condition of the HW wiring and will need to return to it in a few weeks

    I'll reset it and start fresh when I go back to it

Posting Permissions

  • You may not post new threads
  • You may not post replies
  • You may not post attachments
  • You may not edit your posts
  •